Sap ecc 6.0 ehp7 download

broken image
broken image

For example, 616 means that the system is on SAP ERP 6.0 with enhancement package 6. The second digit is not relevant here, and the third digit corresponds to your enhancement package level. Look for the entry SAP_APPL and the release number next to it:įor any SAP ERP 6.0 system the first digit will be 6. The easiest way to find out is to log on to your system and open the system status:

broken image

How can you find your release and enhancement package level? However, mainstream maintenance for SAP ERP 6.0 without enhancement package, as well as SAP ERP 6.0 with enhancement packages 1 to 5, will end on December 31, 2025. When will maintenance end?Īs described in the SAP Release and Maintenance Strategy (login required) and more detailed in SAP Note 2881788 (login required) and the Product Availability Matrix (PAM) mainstream maintenance for the latest three enhancement packages for SAP ERP 6.0 – namely enhancement packages 6, 7 and 8 – runs until December 31, 2027, followed by an optional extended maintenance phase until December 31, 2030. This blog is meant to refresh your memory on the SAP ERP 6.0 maintenance timelines that SAP communicated back in 2020, explain how to find out your release and enhancement package level, and highlight your options to stay in maintenance.

broken image